MATERIAL | | |
CREATE-GENERAL | MM01 | IMMEDIETELY |
| MM11 | SCHEDULE |
CHANGE | MM02 | IMMEDIETELY |
| MM12 | SCHEDULE |
| MM13 | ACTIVATE |
FLAG FOR DELETION | MM06 | IMMEDIETELY |
| MM16 | SCHEDULE |
DISPLAY | MM03 | DISPLAY CURRENT |
| MM19 | DISPLAY AT KEY DATE |
DISPLAY CHANGES | MM04 | ACTIVE CHANGES |
| MM14 | SCHEDULE CHANGES |
| MM17 | MASS MAINTENANCE |
| MMAM | CHANGE MATERIAL TYPE |
OTHER | MMBE | STOCK VERVIEW |
| MMPV | CLOSE PERIOD |
| MMRV | ALLOW POSTING TO |
| | PREVIOUS PERIOD |
| MM50 | INSTANT MATERIAL VIEW |
| MMSC | ENTER STORAGE LOCATIONS |
| MM60 | MATERIAL LIST |
ARCHIVING(MATERIAL) | MM71 | ARCHIVE/DELETE |
| MM72 | DISPLAY ARCHIVE |
BILL OF MATERIAL (MATERIAL BOM) | | |
| CS01 | CREATE |
| CS02 | CHANGE |
| CS03 | DISPLAY |
EXTRAS | CS28 | ARCHIVING |
| CS20 | MASS CHANGES |
EVALUATION/BOM | CS11 | BOM MULTILEVEL |
EXPLOSION/MATERIAL | CS12 | STRUCTURE MULTILEVEL |
BOM | CS13 | SUMMURISED BOM |
WORK CENTRES | | |
| CR01 | CREATE |
| CR02 | CHANGE |
| CR03 | DISPLAY |
| CA85 | REPLACE |
CAPACITY | CR11 | CREATE |
| CR12 | CHANGE |
| CR13 | DISPLAY |
HIERARCHY | CR21 | CREATE |
| CR22 | CHANGE |
| CR23 | DISPLAY |
LINE HIERARCHY | LDB1 | CREATE |
| LDB2 | CHANGE |
| LDB3 | DISPLAY |
REPORTING | CR60 | W/C INFORMATION SYSTEM |
| CR05 | W/C LIST |
| CR06 | COST CENTRE ASSIGNMENT |
| CR07 | W/C CAPACITIES |
| CR08 | W/C HIERARCHY |
WHERE USED | CA80 | WORK CENTRE |
| CR15 | CAPACITY |
| CR10 | CHANGE DOCUMENTS |
EXTRAS | CR09 | STD. TEXTS TASK IST |
| CR41 | ARCHIVING |
ROUTING | | |
STAD. ROUTING | CA01 | CREATE |
| CA02 | CHANGE |
| CA03 | DISPLAY |
REF. OPERATION SETS | CA11 | CREATE |
| CA12 | CHANGE |
| CA13 | DISPLAY |
RATE ROUTING | CA21 | CREATE |
| CA22 | CHANGE |
| CA23 | DISPLAY |
REF. RATE ROUTING | CA31 | CREATE |
| CA32 | CHANGE |
| CA33 | DISPLAY |
EXTRAS | CA85 | REPLACE W/C |
MASS CHANGES | CA95 | REPLACE REF. OP. SET |
| CA75 | REPLACE PRT |
DELETE TASK LIST | CA99 | WITH ARCHIVING |
| CA98 | W/O ARCHIVING |
REPORTING | CA80 | WORK CENTRE |
WHERE USED LIST | CA90 | REF. OP. SETS |
| CA70 | PRODUCTION RESORCE TOOLS |
COST CENTRE | | |
| OKKP | MAINTAIN CONTROLLING AREA |
| KS01 | CREATE COST CENTRE |
| KZS2 | CREATE COSTING SHEET |
| KA01 | CREATE PRI. COST ELEMENT |
| KA06 | CREATE SEC. COST ELEMENT |
| KL01 | CREATE ACTIVITY TYPE |
| KP26 | ACTIVITY TYPE/PRICE PLANNING |
SALES AND OPERATIONS PLANNING | | |
PRODUCT GROUP | MC84 | CREATE |
| MC86 | CHANGE |
| MC85 | DISPLAY |
GRAPHIC | MC91 | PRODUCT GROUP |
| MC92 | OVERVIEW |
PLANNING | MC81 | CREATE |
FOR PRODUCT GROUP | MC82 | CHANGE |
| MC83 | DISPLAY |
| MC75 | TRANSFER PG TO PLANNING |
FOR MATERIAL | MC87 | CREATE |
| MC88 | CHANGE |
| MC89 | DISPLAY |
| MC74 | TRANSFER MATERIALS TO |
| MC9K | MATERIAL AVAILABILITY |
VERSION MANAGEMENT | MC78 | COPY |
| MC80 | DELETE |
FLEXIBLE PLANNING | MC93 | CREATE |
PLANNING | MC94 | CHANGE |
| MC95 | DISPLAY |
| MC9K | MATERIAL AVAILABILITY |
TOOLS/PLANNING TYPE | MC8A | CREATE |
MACRO | MC8B | CHANGE |
| MC8C | DISPLAY |
EVENT | MC64 | CREATE |
| MC65 | CHANGE |
| MC66 | DISPLAY |
ROUGH CUT PLANNING | MC35 | CREATE |
PROFILE | MC36 | CHANGE |
| MC37 | DISPLAY |
ENVIRONMENT | MC90 | TRANSFER MATERIALS TO DM |
ACTIVITY REQT. | KSPP | TRANSFER TO COST CENTRE |
| KSBL | COST CENTRE PLANNING REPORT |
| KSOP | TRANSFER TO ACTIVITY BASED COSTING |
| CPBL | PLANNING REPORT PROCESSES |
| MC9C | REPORTING |
SETTINGS | MC96 | FORECAST PROFILE |
DISSAGGRIGATION | MC76 | BREAKDOWN PG PLAN |
| MC77 | DISPLAY PG PLAN |
| MC75 | TRANSFER PG TO PLANNING |
| MC74 | TRANSFER MATERIALS TO DM |
FORECASTING | | |
INDIVIDUAL FORECAST | MP30 | EXECUTE |
| MP31 | CHANGE |
| MP32 | DISPLAY |
TOTAL FORECAST | MP38 | EXECUTE |
| MP33 | REPROCESS |
| MP39 | PRINT |
| MPBT | EXECUTE BACKGROUND |
| MPDR | PRINT BACKGROUND |
DEMAND MANAGEMENT | | |
PIR | MD61 | CREATE |
| MD62 | CHANGE |
| MD63 | DISPLAY |
| MD65 | REQTS. FOR SCINARIO |
| MD66 | | COPY SIMULATED DEPENDENT REQT. |
| MD70 | COPY TOTAL FORE CAST |
EVALUATION | MD73 | DISPLAY TOTAL REQT. |
| MD79 | EXCELL INTERFACE |
| MD4C | ORDER REPORT |
| MD72 | CHARECTERISTICS PLANNING |
CUSTOMER REQT. | MD81 | CREATE |
| MD82 | CHANGE |
| MD83 | DISPLAY |
REPETITIVE MANUFACTURING | | |
MASTER DATA | C223 | PRODUCTION VERTION | |
PRODUCT COST PLANNING | | |
COSTING RUN | CKMATSEL | CREATE |
SELECTION LIST | CKMATCON | Edit |
| CK40N | EDIT COSTING RUN |
Master Data | MD25 | Create planning calendar |
| MD26 | Change planning calendar |
| MD27 | Display planning calendar |
| MDSA | Display BOM explosion number |
| MDSP | Edit BOM explosion number |
| MEQ1 | Maintain quota file |
| OPPP | Explode BOM by date |
| MDUS | Display project assignment |
| MDUP | Process project assignment |
| MDL1 | Create production lot |
| MDL2 | Change production lot |
| MDL3 | Display production lot |
Planning | MD20 | Create planning file entry |
| MD21 | Display planning file entry |
| MDAB | Set up planning file entry in background |
| MDRE | Check planning file entry |
| MD01 | Total planning online |
| MDBT | Total planning in background |
| MD03 | Single-item, single-level planning |
| MD02 | Single-item, multi-level planning |
| MD43 | Interactive single-item planning |
| MD50 | Multi-level, make-to-order planning |
| MD51 | Multi-level project planning |
| MF52 | Display planning table |
| MF50 | Change planning table |
| MF57 | Planning table by MRP lists |
| MF51 | Planning table by production list |
Evaluations | MD04 | Stock/requirements list |
| MD07 | Collective access of stock/requirements lis |
| MD05 | MRP list |
| MD06 | Collective access of MRP lists |
| MDLD | Print MRP list |
| MD45 | Planning result |
| MD46 | Collective access of planning result |
| MD44 | Planning situation for a material |
| MD47 | Planning situation for a product group |
| MD48 | Cross-plant planning situation |
| MD4C | Order report |
| MD09 | Pegged requirements |
| CO46 | Order progress |
Planned Order | MD11 | Create planned order |
| MD12 | Change planned order |
| MD13 | Individual access of planned order |
| MD16 | Collective access of planned orders |
| MD14 | Individual conversion of planned order into |
| MD15 | Collective conversion of planned orders int |
| MDUM | Convert planned order into purchase requisi |
| CO40 | Convert individual planned order into produ |
| CO41 | Collective conversion of planned orders int |
| CO48 | Partial conversion of planned order into pr |
| COR7 | Individual conversion of planned order into |
| COR7_PC | Collective conversion of planned orders int |
| COR8 | Partial conversion of planned order into pr |
| MDVP | Collective availability check |
| MDAC | Execute action for planned order |
LONG TERM PLANNING | | |
PALNNING SCENARIO | MS31 | CREATE |
| MS32 | CHANGE |
| MS33 | DISPLAY |
PLANNING RUN | MS01 | ON LINE |
| MSBT | SA BACKGROUND JOB |
| MS02 | SINGLE ITEM - MULTI LEVEL |
| MS03 | SINGLE ITEM - SINGLE LEVEL |
| MS50 | SINGLE ITEM - SALES ORDER |
| MS51 | SINGLE ITEM PLANNING, PROJECT |
| MFSO | PLANNING TABLE |
EVALUTIONS | MS05 | MRP LIST MATERIAL |
| MS06 | MRP LIST COLLECTIVE DISPLAY |
| MSLD | PRINT MRP LIST |
| MS04 | STOCK/REQUIREMENTS LIST |
| MS07 | STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY |
| MS44 | PLANNING SITUATION MATERIAL |
| MS47 | SITUATION PRODUCT GROUP |
MPS-MASTER SCHEDULE | ITEMS | |
TOTAL PLANNING | MD40 | ON LINE |
| MDBS | SA BACKGROUND JOB |
| MD41 | SINGLE ITEM - MULTI LEVEL |
| MD42 | SINGLE ITEM - SINGLE LEVEL |
| MD43 | SINGLE ITEM - INTERACTIVE |
| MD50 | SINGLE ITEM - SALES ORDER |
| MD51 | SINGLE ITEM PLANNING, PROJECT |
*** EVALUTION IS SIMILAR TO MRP | | |
PRODUCTION CONTROL | | |
ORDER - CREATE | CO01 | WITH MATERIAL |
| CO07 | WITHOUT MATERIAL |
| CO40 | FROM PLANNED ORDER |
| CO41 | COLLECTIVE CONVERTION OF PLANNED ORDER |
| CO08 | FOR SALES ORDER |
| CO10 | FOR PROJECT |
| CO02 | CHANGE |
| CO03 | DISPLAY |
CONTROL | MD04 | STOCK/REQUIREMENTS LIST |
| COHV | MASS PROCESSING |
| COMAC | COLLECTIVE AVAILABILITY CHECK |
| CO05N | COLLECTIVE RELEASE |
| CO04N | PRINT |
| CO09 | AVAILABILITY OVER VIEW |
GOODS MOVEMENT | MF65 | STOCK TRANSFER FOR RESERVATION |
MATERIAL STAGING | MF68 | LOG |
| MB1A | GOODS ISSUE |
| MB31 | GOODS RECEIPT |
| COWBPACK | PACK MATERIAL |
CONFIRMATION | CO1V | TIME TICKET |
FOR OPERATION | CO14 | DISPLAY |
| CO13 | CANCEL |
| CO1L | REQUESTED CONFIRMATIONS |
| CO1P | PREDEFINED PROCESSES |
TOOLS-ARCHIVING | CO78 | ORDER |
| KOAA | SETTELMENT DOCUMENTS |
CAPACITY PLANNING | | |
EVALUTION | CM01 | LOAD |
| | |
WORK CENTER VIEW | CM02 | ORDERS |
| CM03 | POOL |
| CM04 | BACKLOG |
| CM05 | OVERLOAD |
| CM07 | VARIABLE |
EXTENDED EVALUTION | CM50 | WORK CENTER VIEW |
| CM51 | INDIVIDUAL CAPACITY VIEW |
| CM52 | ORDER VIEW |
LEVELLING | CM21 | PLANNING TABLE (GRAPHICAL) |
WORK CENTER VIEW | CM22 | PLANNING TABLE (TABULAR) |
INDIVIDUAL CAPACITY | VCM27 | PLANNING TABLE (GRAPHICAL) |
| CM28 | PLANNING TABLE (TABULAR) |
ORDER VIEW | CM31 | PLANNING TABLE (GRAPHIcaL) |
| CM32 | PLANNING TABLE (TABULAR) |
AVAILABLE CAPACITY | CR12 | CHANGE |
CAPACITY | CR13 | DISPLAY |
| OP4A | SHIFT SEQUENCE |
| OP43 | FACTORY CALENDER |